About the Project

Darland partnered with OPS to complete Pine Elementary Schoool near 10th and Pine Streets in Omaha.

The site, in the heart of Omaha’s ‘Little Italy,’ was home to Grace University for more than 70 years before Omaha Public Schools purchased it in 2017. The design team worked with the neighborhood association to ensure the new building would match the aesthetic of the historic area. The exterior features finishes like brick, metal panels and simulated stone. Construction plans also called to preserve many of the mature trees on site.

Three additions, totaling over 46,000 square feet, adjoin to the existing gymnasium and student center bringing the building’s total to nearly 113,000 square feet. The K-5 school features four sections at each grade level with additional classroom space for Pre-K and the Alternate Curriculum Program (ACP). The former student center was completely remodeled and now houses the school’s library, art, kitchen, and various staff offices and conference areas.

Tying the new additions into the existing structure presented structural and MEP challenges. “The site, along with meshing the new and the old, makes for a unique build,” said Project Manager Adam Simpson. Because of the way the school sits on the sloped site, the building will include three levels with entrances at each level. Darland was hired as the Construction Manager during the design phase and was instrumental during preconstruction.

Location

Omaha, NE

Size

112,803 SF

Architect

Jackson-Jackson

Recent Projects

Start Your Project Today

Fill out the form below to start your project with Darland. We are happy to answer any questions you might have and look forward to hearing from you!

Name(Required)